Planning and carrying out discharging operations shall be done according to recommen-dations in ISGOTT.
Planning
Prior to each discharging operation, all available information shall be collected on the conditions of the discharging operation, such as limitations in discharging speed, maximum back pressure etc.
The Chief Officer establishes a detailed discharging plan that shows the following in a way [...]
Posts Tagged ‘loading arms’
Discharging
Posted by author on June 12th, 2008
Elasticity of Lines
Posted by author on May 31st, 2008
The elasticity of mooring line is a measure of its ability to stretch under load. Under a given load an elastic line will stretch more than a stiff line. Elasticity plays an important role in the mooring system for several reasons:
High elasticity can absorb higher dynamic loads. For these reason [...]
RSS Feed
Posted in
Tags:




